/brownfield · facility readiness
Brownfield Capacity
Use this self-assessment checklist to determine whether a Michigan or Rust Belt facility can host semiconductor back-end work — packaging support, test, burn-in, calibration, and module assembly. This turns latent industrial capacity into a public inventory.
Facility
- Available square footage (contiguous floor)
- Power capacity (kVA, redundancy)
- HVAC + humidity control
- Compressed dry air (CDA)
- Loading docks + rail access
ESD / cleanliness
- ESD-safe flooring
- Wrist-strap stations
- Ionization at workstations
- Cleanroom class (if applicable)
Equipment
- SMT line capacity
- AOI / X-ray
- Environmental chambers
- Burn-in racks
- ATE / programmer stations
Workforce
- Skilled trades available locally
- Assembly workers
- Quality inspectors
- Apprenticeship program in place
Sample facility profile
facility_name: Example Industrial Site location: Flint, MI available_sqft: 120000 power_capacity: unknown hvac: existing_industrial compressed_air: yes loading_docks: 8 rail_access: no esd_flooring: no cleanroom_ready: partial nearby_workforce: - skilled_trades - assembly_workers - quality_inspectors nearby_suppliers: - machine_shops - tool_and_die - electronics_assembly potential_use: - module_assembly - burn_in - reliability_test - logistics readiness_score: pending