Portal ID: MOMF-2026-SYS-V0

/suppliers · capability directory

Suppliers

12 sample entries across 10 categories. v0 of MOMF publishes representative profiles; v1 adds self-onboarding, certification, and searchable filters by capability, lead time, and minimum order.

Wafer Foundries

Mature-node, MPW-compatible front-end fabs (180 nm, 130 nm, 65 nm).

02 entries

Great Lakes Foundry (sample)

Saginaw, MI
  • 180nm CMOS
  • 180nm HV-BCD
  • MPW shuttle host
Lead time
16–22 wk
Min order
both
Certs
ISO 9001

Midstate Silicon Works (sample)

Toledo, OH
  • 130nm CMOS
  • 65nm LP CMOS
Lead time
20–28 wk
Min order
production

Packaging Houses

Plastic and ceramic packaging — QFN, QFP, BGA, rugged industrial formats.

02 entries

Detroit Packaging Partners (sample)

Warren, MI
  • QFN-up-to-100
  • QFP-up-to-144
  • wire-bond + flip-chip
Lead time
6–10 wk
Min order
both
Certs
ISO 9001, IATF 16949

Lakeside OSAT (sample)

Kalamazoo, MI
  • BGA-up-to-256
  • ceramic SOIC
  • rugged hermetic
Lead time
8–14 wk
Min order
production

Test Labs

Electrical test, ATE, probe, burn-in. Wafer-level and final test.

01 entries

Example Precision Test LLC

Flint, MI
  • ATE final test
  • wafer probe
  • burn-in racks
  • ESD chambers
Lead time
4–8 wk
Min order
both
Certs
ISO 9001

Calibration Providers

Trim programming, EEPROM loading, drift characterization, signed calibration records.

01 entries

Huron Calibration Co. (sample)

Ann Arbor, MI
  • multi-channel SMU
  • climate-chamber trim
  • signed cal records
Lead time
3–6 wk
Min order
both

PCB / Module Assembly

SMT, connectorization, enclosure integration. From pilot to volume.

01 entries

Rust Belt EMS (sample)

Grand Rapids, MI
  • SMT class 3
  • selective solder
  • conformal coat
Lead time
4–8 wk
Min order
both
Certs
IPC-A-610-3, ISO 9001

Thermal Suppliers

Heat sinks, TIMs, rugged enclosures, cooling fixtures.

01 entries

North Coast Thermal (sample)

Cleveland, OH
  • extruded heatsinks
  • graphite TIM
  • rugged enclosures
Lead time
3–5 wk
Min order
both

Fixtures & Tooling

Test nests, sockets, probe fixtures, alignment jigs. The Rust Belt's strength.

01 entries

Midwest Tool & Die (sample)

Lansing, MI
  • CNC fixture machining
  • socket boards
  • ESD nests
Lead time
6–10 wk
Min order
both
Certs
ISO 9001

Reliability Labs

Thermal cycling, vibration, humidity, salt fog, mechanical shock.

01 entries

Mackinac Reliability (sample)

Pontiac, MI
  • thermal cycling -40/+125
  • HTOL 1000hr
  • vibration 20g
  • humidity 85/85
Lead time
6–12 wk
Min order
both

Failure Analysis Labs

X-ray, decap, microscopy, electrical fault isolation, root-cause reporting.

01 entries

Wolverine FA (sample)

Ann Arbor, MI
  • X-ray CT
  • FIB + SEM
  • EFI/OBIRCH
  • decap
Lead time
2–4 wk
Min order
both

Workforce Programs

Apprenticeships, community colleges, UAW training centers. People are the supply chain.

01 entries

UAW–Michigan Tech Apprenticeship (sample)

Statewide, MI
  • ESD technician
  • SMT operator
  • test technician
  • calibration tech
Lead time
12–24 (cohort) wk
Min order
both

Register as a supplier

Michigan or Rust Belt supplier with capacity for semiconductor back-end work?

v0 onboarding is email-based. v1 will add self-service profiles, capability declarations, and supplier-side RFQ matching.

Email supplier intake →