Portal ID: MOMF-2026-SYS-V0

/recipes · operational pathways

Build Recipes

Instead of abstract procurement, MOMF publishes repeatable build recipes. Each one names the inputs, equipment, suppliers, labor roles, facility requirements, and output artifacts. This is how the portal becomes operational — not aspirational.

  1. Recipe 001

    Package an open 180 nm mixed-signal sensor ASIC into a rugged industrial module

    End-to-end pathway from MPW-returned die to a DIN-rail, calibrated sensor module compliant with MOSX-MOD-001.

    Timeline
    8–12 weeks from die receipt to first qualified module
    Suppliers
    4 required
    Roles
    3 labor classes
    Open recipe →
  2. Recipe 002

    Build a CAN-connected rugged motor-control evaluation module

    Carrier-board build path that targets the MOSX-MOD-005 pre-driver profile using the CAN/LIN interface ASIC.

    Timeline
    4–6 weeks from BOM kit to qualified evaluation module
    Suppliers
    3 required
    Roles
    3 labor classes
    Open recipe →
  3. Recipe 003

    Convert a brownfield facility cell into an ESD-safe calibration and test node

    Minimum-viable conversion of an existing industrial cell into a qualified MOMF back-end node.

    Timeline
    10–16 weeks for full readiness audit + commissioning
    Suppliers
    3 required
    Roles
    4 labor classes
    Open recipe →
  4. Recipe 004

    Run a university MPW chip through packaging, test, and module qualification

    Standard pathway for Michigan universities returning MPW silicon to reach a qualified module without bespoke engineering work.

    Timeline
    6–10 weeks from die receipt to evaluation modules in hand
    Suppliers
    3 required
    Roles
    2 labor classes
    Open recipe →
  5. Recipe 005

    Set up a burn-in and environmental stress screening line for mature-node modules

    Reference build for a Tier-3 supplier wanting to add burn-in + ESS capacity to participate in MOMF reliability screening.

    Timeline
    12–20 weeks from facility approval to first qualified lot
    Suppliers
    2 required
    Roles
    3 labor classes
    Open recipe →